Readiness & investment

How should a property owner plan a robotaxi pilot?

Define a narrow operating hypothesis, confirm permissions and responsibilities, rehearse curb operations, and set measurable safety and service criteria.

For: Property executives, mobility teams, operators, municipal partners, and pilot managers. Follow this topic

Short answer

What to know

Start with a specific passenger journey and a written agreement on operator, property, and public-agency roles. Validate the route and handoff, define accessibility and incident procedures, and set success and stop criteria before inviting passengers. A pilot is a test of operations and governance as well as vehicle technology.

Set a narrow test hypothesis

State what the pilot is meant to learn: passenger wayfinding, curb dwell, dispatch reliability, accessible arrival, or coordination with valet. Define a limited location, period, operating hours, participants, and service boundary. A broad 'future mobility' demonstration makes it difficult to identify whether the site or the operating process succeeded.

Before launch, obtain the operator’s vehicle and service assumptions, confirm local permissions, and agree on the passenger-facing description. Determine what happens when the curb is occupied, the vehicle is delayed, a route is blocked, or a passenger needs assistance. Rehearse the handoff with property staff and relevant agency partners.

Measure, govern, and stop safely

Track planned measures such as completed trips, curb conflicts, dwell behavior, route exceptions, assistance requests, accessibility feedback, incidents, and staff effort. Define who can pause the pilot, who notifies passengers, and how the site returns to normal operation. Handle any personal or location data under a documented policy.

Agree in writing on insurance, indemnity, incident reporting, maintenance, emergency contacts, data access, public communications, and the division of operating responsibilities. Review results with the property, operator, and public partners before expansion. A successful pilot in one location does not automatically establish readiness at another property or permission for a broader service.

Put it into practice

A site-planning checklist

  • Specific test hypothesis and bounded site
  • Operator and public permissions confirmed
  • Passenger, accessibility, and incident procedures
  • Named pause authority and stop criteria
  • Post-pilot review before expansion

Further reading

Primary references

  1. NACTO — Curb Appeal

    Curb-management framework for allocating limited public street space.

  2. U.S. Access Board — ADA Standards

    U.S. accessibility standards reference; local applicability and project review still matter.